Portfolio
A selection of projects from over 15 years in mechanical design, manufacturing and project delivery. Client and employer details are kept confidential.
1. Value Engineering — Steel Consumer Product Range
Challenge: Reduce the cost of a range of welded steel products without compromising strength or user experience.
Approach: Material optimisation, simplified weldments and reduced part count, validated with FEA and physical load testing.
Result: Up to 30% cost reduction in key components and 20% faster assembly.
2. Multifunctional Tool — Aircraft Landing Gear Maintenance
Challenge: Four separate tools were needed for one maintenance process, which slowed production.
Approach: Concept design and adaptation of the four tools into a single multifunctional tool, with SolidWorks design and simulation.
Result: 50% reduction in production time. The tool was approved by the landing gear OEM and sold worldwide.
3. HVAC Installation — FIFA World Cup 2014 Stadium
Challenge: Install a large-scale HVAC system at one of Brazil's largest stadiums under a fixed tournament deadline.
Approach: Led on-site installation, coordinating three teams of 10+ people plus subcontractors, and supported the tender evaluation for equipment selection.
Result: System delivered for the 2014 World Cup.
4. Custom Heat Exchangers & Manufacturing Layout
Challenge: Deliver a high volume of custom radiators and heat exchangers to client specifications on tight lead times.
Approach: Design and calculation of units to spec, plus a redesign of the manufacturing layout, tooling and storage.
Result: Faster assembly flow, lower manufacturing time and cost, and a safer workshop.